Maintenance - Honeywell EVCS-CMPT9 Installation, Commissioning And Maintenance Manual

Compact master and slave exchange
Table of Contents

Advertisement

Maintenance

It is a requirement of BS5839pt9 that a maintenance agreement be in place for the EVCS, the maintenance schedule should be as
follows.
Weekly:
Lift a different handset each week and make a call to the Master. Repeat each week until all points are tested.
Record results in the site log.
Monthly:
Test one outstation by lifting the handset, followed by the master calling that outstation. Record results in the site
log.
Quarterly:
Engineer call to check system operation.
Yearly:
Engineer call to check system operation and check battery health.
5 Yearly:
Engineer call to check system operation and replace the batteries.
www.acornfiresecurity.com
22
www.acornfiresecurity.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evcs-xc10

Table of Contents