Download Print this page
Sungrow SC100 Operation Manual
Sungrow SC100 Operation Manual

Sungrow SC100 Operation Manual

Power conversion system (pcs)

Advertisement

Quick Links

SC100
Power Conversion System (PCS)
Operation Manual

Advertisement

loading

Summary of Contents for Sungrow SC100

  • Page 1 SC100 Power Conversion System (PCS) Operation Manual...
  • Page 7       ...
  • Page 8  ...
  • Page 10  ...
  • Page 11            ...
  • Page 12            ...
  • Page 13          ...
  • Page 14            ...
  • Page 15 Power Plant Wind Power Plant PV Power Plant EV Charging Station Discharge Charge Energy Storage Device Power Load      ...
  • Page 16        EMERGENCY EMERGENC STOP STOP...
  • Page 17 POWER OPERATION FAULT POWER OPERATION FAULT POWER OPERATION FAULT POWER OPERATION FAULT       ...
  • Page 18   RS485/232 convertor ...
  • Page 19  Ethernet switch RS485 or CAN...
  • Page 21        ...
  • Page 22  ...
  • Page 23    ...
  • Page 24  ...
  • Page 25 Power on Normal for the first operation time Fault 1.Input&output meets the operation requirements 2.Receive corresponding instruction Initialization Stop/ Receive stop/standby instruction Standby Self-detection complete 1.No fault occurs 2.Emergency stop button is released Emergency 3.Emergency stop turns to stop Stop...
  • Page 26    ...
  • Page 27 EMER GENC...
  • Page 29  ...
  • Page 34    ...
  • Page 44   − − − −...
  • Page 47 Power station operates normally Power station disconnects from the grid Time (s)
  • Page 48         ...
  • Page 49       ...
  • Page 50       ...
  • Page 51                           ...
  • Page 52     ...
  • Page 54             ...
  • Page 60 ℃ + ℃        ...
  • Page 61   ...