ADURO DraftOptimizer User Manual And Installation Manual page 24

Hide thumbs Also See for DraftOptimizer:
Table of Contents

Advertisement

Available languages

Available languages

Aduro DraftOptimizer in steel with grey cable
-
Green cord in no. 4 terminal
-
White cord in no. 5 terminal
-
Brown cord in no. 6 terminal
Brown 6
Mounting of control cable to control box:
Put the white control cable through the other opening in the side of the control box and mount the
cords as described below:
-
Blue cord in no. 1 terminal (GND)
-
Yellow cord in no. 2 terminal (CTRL)
-
Red cord in no. 3 terminal (24V+)
Mounting of speed regulator:
The white control cable is run through the loft and
through the floor to the wanted location for the speed
regulator. This can be done through the chimney's loft
collar/top and down along the wall to the wood burning
stove.
The white control cable is mounted on the speed
regulator by removing the back of the speed regulator
and mounting the cords as described below:
-
Red cord in no. 1 terminal (24V+)
-
Yellow cord in no. 2 terminal (CTRL)
-
Blue cord in no. 3 terminal (GND)
The white control cable is placed in the cable slit before
the back is clicked back on. The speed regulator can
then be mounted on the wall with self-adhesive tape or
screws.
Note: The speed regulator cannot be mounted
outside.
Black 5
Red 4
Red 3
Yellow 2
21
Blue 1

Advertisement

Table of Contents
loading

Table of Contents