Download Print this page

Advertisement

Quick Links

................................................
................................................
......................................
Supports 10-25 lbs. Can support monitors up to 28" each
(as long as the combined monitor weight does not exceed
maximum weight capacity.)
Installation may require two people.
Page 3
Page 4
..................................
Page 5
Page 6
(optional) ................
Page 7
.................................
Page 8
...................................
Page 9
........................
Page 10
WS1-90 Installation Instructions
PAGE 1 OF 11

Advertisement

loading
Need help?

Need help?

Do you have a question about the WS1-90 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mockett WS1-90

  • Page 1: Table Of Contents

    WS1-90 Installation Instructions Step 1 | COLUMN ..........Page 3 Step 2 | MOUNTS ..........Page 4 Step 3 | WORK SURFACE ........Page 5 Step 4 | CENTER BEAM ........Page 6 Step 5 | EXTENSION BEAMS (optional) ....
  • Page 2 WS1-90 Parts List* Work Surface 1/8" Allen Wrench 10-32 x 9/16" FHSCS QR VESA Adapter 10-32 x 1" FHSCS 411469 701312 711100 109464 711467 Extension Beam (10" or 20") Monitor Cup 111098-10 or 111098-20 411351 Column Column Clamp 7/32" Allen Wrench...
  • Page 3: Step 1 | Column

    Step 1 COLUMN IMPORTANT: Do not pull excessively on cable – doing so may result in accidental actuation of column. Confirm cable is properly seated into position. Use 7/32" Hex key to press cable firmly into place. PAGE 3 OF 11...
  • Page 4: Step 2 | Mounts

    Step 2 FREESTANDING BASE | MOUNTS Hang base plate over edge of Place work surface work surface to allow access on base plate to aid as a to countersunk holes. Side counterbalance. of base plate with felt pads should be face down. D or E Note the orientation of column cable exit and...
  • Page 5: Step 3 | Work Surface

    Step 3 WORK SURFACE Slide utility tray onto work surface. Utility tray simply rests on top of work surface. Two people may be required to install work surface to column. One to hold the work surface and the second person to secure the column clamp.
  • Page 6: Step 4 Center Beam

    Step 4 CENTER BEAM 1/8" 1/8" 1 1 1 IMPORTANT: Tighten bolts evenly. 3 3 3 4 4 4 The beam should sit flush against the column, ensure there are no gaps. Also, it is important the work surface clamp is level. PAGE 6 OF 11...
  • Page 7: Step 5 | Extension Beams (Optional)

    Step 5 EXTENSION BEAMS (optional) 1/8" 1/8" 1/8" PAGE 7 OF 11...
  • Page 8: Step 6 Monitor Tilter

    Step 6 MONITOR TILTER STANDARD TILTER & SPRING TILTER PAGE 8 OF 11...
  • Page 9: Step 7 | Monitor Cups

    Step 7 MONITOR CUPS 7/32" 1/8" PAGE 9 OF 11...
  • Page 10: Step 8 | Cable Management

    Step 8 CABLE MANAGEMENT PAGE 10 OF 11...
  • Page 11 HEIGHT ADJUSTMENT Press button and hold. Lift up/down. Release to lock in place. Is your height adjust button not working? If so, make the adjustments below. Slide workstation so that the work surface hangs over desk edge to allow access to underneath the work surface.