Installing The Source Module - ABB MB3000 Series Installation And User Manual

Ftir spectrometers
Table of Contents

Advertisement

Section 7 Module Replacement
You do not need to cut the wires connecting the source control board to the source
module. The replacement kit includes the source and the source control board.
STEP 5
Connectors are fragile, make sure to manipulate connectors with caution.
STEP 6
STEP 7

Installing the Source Module

STEP 1
STEP 2
STEP 3
STEP 4
After installing the Source module, check the LED statuses to make sure
spectrometer is ready for use. Refer to
allow spectrometer initialization and stabilization.
AA003700-01 rev. G. 2.0
Remove the source control board from the spectrometer and gently unplug the
two connectors
Unscrew with a 2.5 mm Hex driver the 3 captive screws of the Source module.
Remove the Source module from the spectrometer.
Power OFF the spectrometer. Refer to
Set the Source module into place.
Connect all two connectors and tighten the 3 captive screws holding the Source
Module into place. Do not overtighten.
Set the source control board (installed on its bracket) into place. Refer to
Figure 7- 4
.
Installing the Source Module
Lockout/Tag Out Procedure
Table 6-
1. A delay may be required to
on page 10.
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents