Conduit Installation

Detectors should be located to cover the specific "fire threat" areas.
When planning the conduit, observe the following
recommendations.
1. If only one of the two ¾ inch NPT conduit openings of the
Detector enclosure is used, appropriately seal the unused
opening with a threaded, tapered plug.
2. In areas where moisture may accumulate, install an approved
conduit trap or drain.