York 19 SEER Installation Manual page 25

R-410a 2-stage outdoor split-system air conditioning 2 – 5 tons – 1 phase
Table of Contents

Advertisement

SECTION X: START UP SHEET
Residential Split 2-Stage Capacity System Unit Cooling With Electric Heat Start-Up Sheet
Start-Up Date
Dealer Training Certification Number
Owner Information
Name
City
Equipment Data
Outdoor Model #
Indoor Coil/Air Handler Model #
Furnace Model #
Thermostat #
General Information
New Construction
Unit Location and Connections
Unit is level and installed on:
Condensate drain properly connected per the installation instructions
Filters
Filters installed
Electrical Connections & Inspection
208 volts AC
Inspect wires and electrical connections
Low voltage present at control board "R & C"
Line voltage present at disconnect
Compressor amperes "L1"
Air Flow Setup / Cooling
Blower Type
&
Set-Up
Supply static (inches of water column)
Return static (inches of water column)
Total external static pressure
Johnson Controls Unitary Products
Proper start-up is critical to customer comfort and equipment longevity
Company Name
Address
State or Province
(Check all that apply)
Roof level
Grade level
(Check all that apply)
Slab
Roof curb
Filter size
(Check all that apply)
230 volt AC
Transformer wired properly for primary supply voltage
Measured voltage "L1 to L2"
"L2"
COOL
ECM
ADJUST
DELAY
Supply air dry bulb temperature
Return air dry bulb temperature
Temperature drop
Start-Up Technician
Unit Serial #
Unit Serial #
Unit Serial #
Unit Serial #
Upflow
Duct connections are complete:
Condensate trap has been primed with water
Measured voltage "R" and "C" outdoor unit control board
Total amperes "L1"
A
B
A
B
A
B
5390862-UIM-A-0318
Daytime Phone
Zip or Postal Code
Horizontal
Supply
Ground connected
"L2"
C
D
C
D
C
D
Supply air wet bulb temperature
Return air wet bulb temperature
Outside air dry bulb temperature
Page 1 of 2 (9/27/17)