INSTALLATION INSTRUCTIONS
Installation
Leveling
WARNING: Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than necessary.
1
Position the brewer on the counter top. Level it left to
right and front to back by turning the bottom of the
legs.
Connect the Water Supply
2
Flush the water supply line prior to installation to
3
the back of the brewer. Leave the water supply valve
closed until the power is connected.
Connect the Brewer Wiring
WARNING: Turn off power to the junction box at
the circuit breaker panel before connecting the
power cable to the brewer. Lock out and tag the
circuit breaker.
4
Remove the screws that hold the front cover and brew
deck in place and remove them.
5
Loosen the strain relief on the back of the brewer.
6
Feed the power cable into the brewer.
7
Connect the wires on the power cable to the terminal
block inside the brewer.
8
Tighten the strain relief and replace the front cover
and brew deck.
9
Connect the power cable wires to the terminals in the
junction box. See the ELECTRICAL SCHEMATIC for
the power supply requirements.
Front
Brew
panel
deck
label
II15
block
120517B