Putting Into Operation After Scheduled Out-Of-Service-Period - MTU 20V4000G*3 series Operating Instructions Manual

6 exhaust turbochargers
Table of Contents

Advertisement

6.2 Putting into operation after scheduled out-of-service-period

Preconditions
☑ Engine is stopped and starting disabled.
Putting into operation
Item
Lube oil system
Coolant circuit
Coolant circuit
Fuel prefilter
Monitoring system
Engine/generator control
system
122 | Operation | MS150093/05E 2018-12
Action
Check engine oil level (→ Page 242);
Check engine coolant level (→ Page 252).
Check charge-air coolant level (→ Page 274).
Heat engine coolant with coolant preheater.
Drain water (→ Page 221), (→ Page 223).
Carry out lamp test (see manufacturer's documentation).
Switch ON;
Select operating mode, e.g.: MANUAL, AUTOMATIC OPERATION.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents