6. Wet the permeate carrier with water or the fluid to be processed and place it into the
cavity in the cell top. The surface tension caused by wetting the carrier will keep it in
place.
7. Complete the assembly of the cell body by placing the cell top onto the cell bottom.
The alignments holes should fit snugly over the alignment pins in the cell bottom.
7
Sterlitech Corporation | Sepa CF Cell Manual
Need help?
Do you have a question about the SEPA CF CELL and is the answer not in the manual?