Dri-Eaz BD1000 Owner's Manual

Dri-Eaz BD1000 Owner's Manual

Building dryer

Advertisement

Owner's Manual
Dri-Eaz
®
Building Dryer BD1000
F435-DV (110–230V UK)
Legend Brands Holdings, Ltd.
22 Plover Close, Interchange Park, Newport Pagnell, MK16 9PS
Tel: +44 (0)1908-611-211 Fax: +44 (0)1908-611-363 www.dri-eaz.co.uk
WARNING: Read and understand these warnings and instructions.
DO NOT operate the unit with covers open or removed.
WARNING: Do not alter or modify your BD1000 in any way. Use only replacement
parts authorized by Dri-Eaz Products. Modifications or use of unapproved parts
could create a hazard and will void your warranty. Contact your authorized Dri-
Eaz distributor for assistance.
WARNING:
Unplug before servicing.
WARNING: ELECTRIC SHOCK HAZARD
Unplug before opening cover.
Use with a residual current device (RCD) where possible.
Ensure power cord is properly earthed.
Check that power cord is not damaged.
Unplug before opening cover.
WARNING:
Moving parts may injure hands. Unplug before servicing.
WARNING:
Surfaces may be hot. Allow unit to cool before servicing.
07-01742C F435-DV (110–230V UK)
1
Legend Brands Holdings, Ltd.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BD1000 and is the answer not in the manual?

Questions and answers

NILAY ERSEN
August 5, 2025

Hi, the humidity level in the air is 52. The dehumidifier is still running but no water is coming out anymore. is that normal? Shall i turn the machine off? Thank you.

Summary of Contents for Dri-Eaz BD1000

  • Page 1 WARNING: Read and understand these warnings and instructions. DO NOT operate the unit with covers open or removed. WARNING: Do not alter or modify your BD1000 in any way. Use only replacement parts authorized by Dri-Eaz Products. Modifications or use of unapproved parts could create a hazard and will void your warranty.
  • Page 2 INITIAL INSTALLATIONS HANDLE INSTALLATION 1. Remove 2 screws on top of moulded cover (A). 2. Hinge open front cover (B). 3. Place handle in upright position (C). 4. Secure handle with supplied screws, Nyloc nuts and washers (D) as shown 5.
  • Page 3 POWER SETUP UK power cord replacement fuses. 1. Remove 2 screws on top of moulded cover and hinge open. 2. Voltage selection. Select 115V or 230V on the VOLTAGE SELECTION switch (A). 3. Plug correctly rated power cord (D) into power receptacle (B).
  • Page 4 USER CONTROLS, DRAIN, AND AIR OUTLETS (A) Control panel (see Control Panel Detail below). (B) Condensate drain hose connector. Attach hose with quick-connect, then uncoil completely, ensuring there are no kinks or restrictions. Place end in drain or receptacle before operation. (C) Process air outlets.
  • Page 5 METER LOCATION, TOP VIEW, COVER OPEN (A) Hour meter (B) kW-hour meter Storage & Transport Store the building dryer vertically. If transported horizontally, position dryer in normal operating position and leave in place for 30 minutes to allow refrigerant to recirculate before use. 07-01742C F435-DV (110–230V UK) Legend Brands Holdings, Ltd.
  • Page 6 CLEANING Safety Precautions IMPORTANT. Unplug unit from electrical supply before starting to clean. Filter 1. Optional 4-PRO filters should be replaced whenever the accumulation of dust or debris is visible. 2. Standard fibreglass and paper filters cannot be cleaned and should be replaced when full. External Cleaning 1.
  • Page 7 Interchange Park Newport Pagnell MK16 9PS United Kingdom Tel. +44 (0)1908 611211 Fax. +44 (0)1908 611363 SPECIFICATIONS Building Dryer BD1000 Name Model F435 Dimensions (W × H × D) 50 × 51 × 85 cm Weight 39 kg Water removal (AHAM) 25 L/day (27°C/60%RH)

Table of Contents