Launch TLT245AT User Manual page 34

Two post lift
Table of Contents

Advertisement

Launch
Column
立 柱
Cylinder
油 缸
直 通 长 管 接 头
Fitting
5.2.11 Install the swing arm
Install the swing arm as Fig.13
Check if the positioning gear mechanism at the end of arm
fits, adjust the Screw s of fixed semi-gear for its fitness.
Note: :
During the installation, lubricate the moving parts of
swing arm and carriage ,so that the swing arm can move
freely.
Make sure the arm positioning gear is engaged!
TLT245AT / TLT250AT(C) Two-post lift's Installation manual
assembly
Oil hose
扣 压 式 胶 管 总 成
Fig 12
13
¢10 Spring washer
¢ 10弹 垫
¢10 Flat washer
¢ 10平 垫
M10× 25螺 栓
螺栓
M10×20
M10×20 Bolt,2 sets
2套
泵站接头
可 调 向 接 头
Fitting Hose
三 通 管 接 头
T fiiting
Power unit
液 压 站
扣 压 式 胶 管 总 成
assembly
Oil hose
Fitting
直 通 长 管 接 头
Fig. 13
高 压 软 管

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tlt250at(c)

Table of Contents