Honeywell
10.4.9 Cycle time
Operations: Read/Write
Meaning:
It's a value in points (0 – 255, 0 – FF Hex).
Each step is 50msec .
When single cycle (SC) and burst firing (BF) is used must be setted at 240 (FO Hex)
When SSR input is used set at 240 (FO Hex)
When is used zero crossing (ZC) represents the cycle time
(ON time + OFF time, default 60(3C Hex) )
10.4.10 Number of half periods for DT firing
Operations: Read/Write
Meaning:
Must be setted at 1.
www.honeywell.com/imc
CD3000M-3PH up to 90A
ON OFF
20%
50%
70%
100%
Time
Cycle Time
50
User's Manual
Parameter 127H
Parameter 128L