Download Print this page

Honeywell HPMOM6CB Installation Instructions page 3

Power distribution controller

Advertisement

Two (2) or more Controller Switcher Boards can be connected together as follows: Link the Alarm output from the
first Controller and remove jumper JR of the first Controller. JR must be removed from second Controller if a third
Controller is used and so on. See figure below.
WARNING: To reduce risk of electric shock, do not expose unit to rain or excess moisture, and disconnect
!
power before servicing unit.
For continuous protection against hazard, replace fuses only with exact type and rating. A readily accessible
switched circuit breaker must be available to disconnect main power as required. All 120V wiring should be routed
so that it cannot touch 24V wiring; minimum spacing 3/8" (0.953cm). Installation and servicing should only be
made by qualified personnel; contains no user-serviceable parts. Install in accordance with all local regulations
and the National Electrical Code.
For additional information:
• Visit our website at http://www.honeywellpower.com
• Contact Technical Support at 1(877) HPP-POWR
• E-mail us at hpp.techserv@honeywell.com
HPMOM6(CB) Installation Document P/N 52385:A 1/11/06
3

Advertisement

loading