Download Print this page
Inepro PRO-380-S User Manual
Hide thumbs Also See for PRO-380-S:

Advertisement

Quick Links

CAUTION
Turn off and if possible lock all sources supplying the
energy meter and the equipment that is connected to it
before working on it.
Always use a properly rated voltage sensing device to
confirm that power is off.
The connecting wire, connecting the device to the outside
circuit, should be sized in accordance with local
regulations for the maximum amount of the current
breaker or other overcurrent protection devices used in
the circuit.
An external switch or a circuit-breaker should be installed
on the supply wires, which will be used to disconnect the
meter
and
the
device
recommended that this switch or circuit-breaker is placed
near the meter because that is more convenient for the
operator. The switch or circuit-breaker should comply with
the specifications of the building's electrical design and all
local regulations.
An external fuse or thermal cut-off used as an overcurrent
protection device for the meter must be installed on the
supply side wires. It's recommended that this protection
device is also placed near the meter for the convenience
of the operator. The overcurrent protection device should
comply with the specifications of the building's electrical
design and all local regulations.
This short user manual does not contain every applicable safety regulation for using this meter. Also it might be required because of
company, local governement regulations or (inter)national laws to take additional measures. We have checked the contents of this manual
and every effort has been made to ensure that the descriptions are as accurate as possible. However, deviations from the description
cannot be completely ruled out, so that no liability can be accepted for any errors or omissions in the information given. Versions might
different in default programming based on the customers order.

Meter specifications

Voltage 230/400VAC; Current 5/100A or 1.5/6A; Frequency 50Hz; LED 10.000 pulses/kWh; S0 1.000 pulses/kWh; Accuracy class
B; Operating temperature -25°C - +70°C (PRO380 CT MID), -40°C - +70°C (PRO380 100A MID); IP51; LCD scroll time 10s;
backlight button mode; calculation method C11 (total energy = forward -\- reverse).
Certificates
Short User Manual PRO-380 kWh Meter
Thanks for choosing the Smart PRO380 Meter from Inepro.
supplying
energy.
It
is
Type PRO380-S, PRO380-Mb & PRO380-Mod MID
The installation should be performed by qualified personnel familiar with
applicable codes and regulations.
Use insulated tools to install the device. A fuse, thermal cut-off or single-
pole circuit breaker should be fitted on the supply line and not on the
neutral line.
This meter can be installed indoor, or outdoor enclosed in a meter box
which is sufficiently protected, in accordance with local codes and
regulations.
To prevent tampering, an enclosure with a lock or a similar device can be
used.
The meter has to be installed against a fire resistant wall.
The meter has to be installed in a well-ventilated and dry place.
The meter has to be installed in a protective box if the meter is exposed
to dust or other contaminants.
The meter can be installed and used after being tested and can be sealed
afterwards.
The device can be installed on a 35mm DIN rail.
The meter should be installed on a location where the meter can be read
easily.
In case the meter is installed in an area with frequent surges for example
due to thunderstorms, welding machines, inverters etc., the meter is
required to be protected with a Surge Protection Device.
The device should be sealed immediately after installing it in order to
prevent tampering
The device should be installed with a torque screw driver.
Inepro Metering – V1.03
WARNING

Advertisement

loading

Summary of Contents for Inepro PRO-380-S

  • Page 1: Meter Specifications

    Short User Manual PRO-380 kWh Meter Type PRO380-S, PRO380-Mb & PRO380-Mod MID Inepro Metering – V1.03 Thanks for choosing the Smart PRO380 Meter from Inepro. CAUTION WARNING   Turn off and if possible lock all sources supplying the The installation should be performed by qualified personnel familiar with energy meter and the equipment that is connected to it applicable codes and regulations.
  • Page 2 Short User Manual PRO-380 kWh Meter Type PRO380-S, PRO380-Mb & PRO380-Mod MID Inepro Metering – V1.03  Connection diagram (3 phase/4 wire)* Direct connected (100A version) CT connected (CT version) * 1 phase 2 wire and 3 phase 3 wire connection also possible ...

This manual is also suitable for:

Pro380-modPro380 seriesPro-380-mb