Download Print this page

Nortec Se Series Installation And Operation Manual page 25

Hide thumbs Also See for Se Series:

Advertisement

High voltage
terminal block
Note:
1 Dedicated external fused
disconnect must be installed.
Fusing must not exceed max
circuit protection as indicated
on the specification label.
2 Ensure that adequate power is
available to carry full humidifier
amp draw as indicated on the
specification label.
3 All wiring to be in accordance
with national and local electrical
codes.
SETC / P Primary Power
Single Phase Supply
Ground
L1
Neutral
Dedicated circuit
breaker or fused
Knockouts provided
in top and bottom panels.
Install strain relief (by others)
Ground
E
I
X
N
T
T
disconect.
L1
Neutral

Advertisement

loading