5. Using the screwdriver, remove the retaining screw and kit (F) for the
malfunctioning circuit breaker (E) (for main breaker only).
6. Lift the circuit breaker (E) from the breaker box.
7. Note the color coding and placement of the wires in the circuit breaker (E).
8. Remove one, two, or three wires from the one-pole, two-pole, or three-pole
circuit breaker (E).

Replacement

1. Install the color-coded wires in the circuit breaker (E) in their original
places.
2. Align the circuit breaker (E) and the retaining screw and kit (F) if so
equipped, to install the screw that holds the circuit breaker (E) in place.
3. Install the dead front panel (A) and breaker cover assembly (B).
4. Remove the lockout and tagout from the building circuit breaker,
5. Set the building circuit breaker back to the ON position.
6. Check the Integris® 2000 Headwall System circuit breaker (G) for proper
functionality in its circuit.
Integris® 2002 Headwall System Service Manual (man142rb)
4.12 Circuit Breaker (Standard/Emergency Power)
Chapter 4: Removal, Replacement, and Adjustment Procedures
4
Page 4 - 29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Integris 2002 and is the answer not in the manual?

Table of Contents