Tool and Supply Requirements
To service the Integris® 2000 Headwall System, the following tools and
supplies are required:
• Screwdriver
• Phillips head screwdriver
• Pliers
• Adjustable wrench
• Digital multimeter
Installation and Post-Installation Inspection
Upon request, a WittRock representative may periodically check with the
contractor during initial installation and assist the contractor in the final check
to make certain the installation is in operating condition. WittRock and the
contractors have the following responsibilities:
• WittRock supplies complete installation instructions with every Integris®
2002 Headwall System. These instructions reflect the variations in each
system as ordered.
• In seismic code areas, WittRock supplies additional installation
information, upon request.
• WittRock supplies the hanger bracket, consisting of a steel wall plate and
mounting fasteners.
• The electrical contractor furnishes and installs conduit with wiring to the
hanger bracket knockout plate. The contractor connects building services
to the pre-wired junction box as shown in the electrical drawings in the
installation instructions.
• After installation, the electrical contractor is responsible for checking the
entire system for proper operation.
• The mechanical contractor provides and installs primary connections to the
Integris® 2002 Headwall System medical gas manifold as detailed on the
drawings. The mechanical contractor performs and certifies all pressure
tests as required by NFPA-99 (nonflammable medical gas systems) and
any local codes.
• The final certification is the responsibility of the electrical and mechanical
contractors for their portions of the installation.
Integris® 2002 Headwall System Service Manual (man142rb)
Tool and Supply Requirements
Chapter 6: General Procedures
Page 6 - 7
6
Need help?
Do you have a question about the Integris 2002 and is the answer not in the manual?