• Accurate to +/-2.5% FSD 4. Eyebolt Testing • Indication of pull-out load 5. Re-bar operating instructions • Rise and fall output 6. 2008 MODEL TESTER ASSEMBLY • Maximum load achieved function TO 12.5 TON LOAD SPREADING • Calibration in kN BRIDGE •...
9. 5 Threaded Adaptors Fig 1 3. 0-145kN Digital Gauge M20 > M12, M16, M20, M24, M30 for the model 2008 tester and directs (Bluetooth version optional for recording 10. Spirit level reaction loads away from the fixing (fig 1).
2. General Testing Procedure - set up 3. General Testing Procedure - Operating the tester Assemble the load spreading bridge. Switch the digital gauge on (see separate Fig 10 Fig 6 gauge operating instructions in this Secure the tester to the bridge if manual).
4. Eyebolt testing 5. Re-bar operating instructions 1. The Model 2008 Portable Heavy Duty 1. Screw the M20 connecting rod into Fig 11 Tester will accept Rebar adaptors 6mm, the heavy duty clevis and ensure the 8mm, 10mm, 12mm, 14mm, 16mm, thread engages fully so is flush with the 18mm, 20mm &...
Return to ‘Normal rise and fall’ mode A button and active LED on the top of 1. Press then and display shows MAX. the Model 2008 tester housing indicates that the tester is equipped with this feature 2. Press and display reads OFF. (fig 18).
If Hydrajaws Bluetooth Digital is fitted (A Fig 27 button and active LED on the top of the Model 2008 tester housing indicates that the tester is equipped with this feature) then an extra cable needs to be disconnected. 1. Follow procedure for removing dust cover, gauge and battery.
Page 9
FOR MORE INFORMATION ON HYDRAJAWS AND A FULL RANGE OF TESTING APPLICATIONS PLEASE VISIT THE WEBSITE AT: WWW.HYDRAJAWS.CO.UK H Y DR A JAW S L I M I T E D 20/21 The Courtyard Gorsey Lane Coleshill Birmingham B46 1JA, UK.
Need help?
Do you have a question about the 2008 and is the answer not in the manual?
Questions and answers