Connection Topological graph:

Installation requirements

1. The display surface for installation should be flat. For a better touch performance, the flatter the
surface is, the easier the adjustment will be.
2. Take care of interference from sunlight when install it. We recommend using dark curtains for better
results.
3. The USB cable or adapter cable cannot be cut or spliced.
4. Before installing the projector, please leave 7cm between the top side of projection screen and the
inner frame of the whiteboard for emitter installation.
5. Before installing the emitter, please put one piece of 3M adhesive tape on the back side of emitter
body. Measure the central point of the top side of projection screen, paste and fix emitter 3cm above
the central point.(Note: the central point of emitter and the central point of projection screen should be
on the same straight line.)
6. Please secure emitter by 4 screws for long term use.
7. Mount camera on top of the projector, please fix camera firmly after adjusting the camera's image in
correct position and leave no parts loose.

Hardware Installation

Emitter (3.3V,2A)
Size:3.5cm*17cm*2.4cm
5
Sensor
Attach to the projector
V
G
A
USB