Read Me First - Leading Edge LE-600 Installation & Operation Manual

1.55m diameter micro wind turbine for generating clean and renewable electricity anywhere the wind blows
Table of Contents

Advertisement

Read this first
Don't connect the wind turbine in the wrong polarity
Make sure you connect the +ve of the turbine to the +ve of the battery (red to
red) and the -ve of the turbine to the -ve of the battery (black to black). Failing
to do so will damage the equipment and invalidate your warranty.
Don't connect the Diversion Charge Controller in series with the turbine
Always ensure that the turbine and the controller are connected to the battery
separately. Failing to do so will damage the equipment and invalidate your
warranty.
Don't allow the turbine to run without being connected to the battery
Failing to do so will result in the turbine freewheeling causing premature wear
and tear and unnatural blade noise.
The Tristar charge controller must be configured for Diversion mode
Failing to do so will invalid your warranty as this can burn out the stator.
http://youtube.com/c/LeadingEdgeTurbines
Visit our YouTube channel for assistance in wiring up the equipment,
configuring the Tristar charge controller and more.
Tel: +44 (0) 1981 241668
www.leadingedgepower.com
Page 3 of 48 Rev Q

Advertisement

Table of Contents
loading

Table of Contents