Installation and User Guide
When you have finished wiring and configuring the unit, re-apply power to the unit and wait at
least two minutes then test the connection to the central station by creating an alarm from the
panel.
Note: The DIP switches are only read immediately after the unit is powered up. Always cycle the
unit's power after making changes to the DIP switch settings.
2.1.1 5500EZ Front Case and Circuit Board
4 1 3 4 6 4 7
Figure 2 - 5500EZ FRONT CASE AND CIRCUIT BOARD
R e v 2
Se pt e m be r 1 2 , 2 0 1 8
Installation
1 3