Download Print this page

Donco V625 Assembly Instructions

Full bed venice

Advertisement

Quick Links

ASSEMBLY INSTRUCTIONS
V625 Full Bed Venice
Thank you for purchasing this quality product. Be sure to check all packing
material carefully for small parts which may have come loose inside the
carton during shipment. Separate, identify and count all parts and hardware.
Compare with the parts list to be sure all parts are present.
"DO NOT TIGHTEN SCREWS UNTIL COMPLETELY ASSEMBLED"
!
* Use of power tool to assemble this
product will invalidate any claim and
damage this product making unsafe !!!
* Please assemble on a clean soft
surface to avoid damage.
PLEASE READ INSTRUCTION BEFORE STARTING THE ASSEMBLY
12
1
11
2
10
+
9
3
4
8
7
5
6
1:00 h
IMPORTANT:
Tools Required
(Not includ)
(Hammer)

Advertisement

loading
Need help?

Need help?

Do you have a question about the V625 and is the answer not in the manual?

Questions and answers

Summary of Contents for Donco V625

  • Page 1 ASSEMBLY INSTRUCTIONS V625 Full Bed Venice Thank you for purchasing this quality product. Be sure to check all packing material carefully for small parts which may have come loose inside the carton during shipment. Separate, identify and count all parts and hardware.
  • Page 2 Part List: - V625 FULL BED VENICE Identifying the Hardware/part list- Identify the hardware using the illustrations below. 1/4" Half Moon 4,0X30 Screw 1/4 X 70 Screw 10X40 Wood Dowel 8,0X35 Wood Dowel 0,4mm/ Hex Screwdriver Cód.: 4072 3,5X16 Screw...
  • Page 3 4,0X30 Screw 8,0X35 Wood Dowel 0,4mm/ Hex Screwdriver 1/4" Half Moon 1/4 X 70 Screw...
  • Page 4 When fixing the Support (H) carefully line up the screw holes with those pre-drilled marks on the Headboard and Footboard, this will ensure the best assembly. 3,5X16 Screw 3,5X16 Screw...
  • Page 5 The first slats must be fixed here at 3” from each headboard end. 4,0X30 Screw...