Parts list A-FRAME 666 681 692 694 202 491 492 493 494 mm 1535 1571 1535 1500 850 M6X10 M6X15 M6 Side Wall Roof 634 666 672 722 702 681 716 751 mm 2776 1535 2776 2055 2055 M6X10 mm 2776 1571 2769 400 2084 M6X10 M6 2 Vents...
Page 3
Start with your completed greenhouse frame To add an extension unit disconnect the complete rear gable, together with the base. Put them aside for re-attachment later.
Page 4
Crop bolts Washer Extending the base Width Length Combination 2751 6319 one Titan 912 + one HB9 extension 2751 7013 one Titan 914 + one HB9 extension 2751 9095 one Titan 912 + two HB9 extension 2751 9789 one Titan 914 + two HB9 extension...
Page 5
A-frame Layout The A frame needs to be fitted to the original greenhouse. You need two side glazing bars (666) and two side bar braces (694). First insert three 15mm bolts into the channel on the back of the glazing bar. Lo- cate these bolts with the holes on the short flange on the side bar brace (694) and with them equally spaced lightly tighten.
Page 9
(note: the shut rails should be attached after the greenhouse has been glazed). For vent installation refer to your main Titan 9xx manual. 12. Once the frame has been constructed you can return to the Titan 912 / 914 instruction book and continue with the assembly.
Need help?
Do you have a question about the Titan 912 and is the answer not in the manual?
Questions and answers