Instructions - Rainbow Funhouse Assembly, Use And Service Manual

Hide thumbs Also See for Funhouse:
Table of Contents

Advertisement

Step 1
*NOTE: Pre-drill all holes for Lag Bolts with the appropriate drill bit.
*NOTE: Do not tighten hardware in #1 at this time.
1. Lay Corner Uprights (76) on the ground. Attach Top Joist with Swing Holes (77) to Corner Uprights
(76) using 3/8" Hardware (H3) (H11) (H17) (H56) and 1/2" Hardware (H4).
*NOTE: 4 Hole Facias (50) must be flush with the bottoms and sides of Corner Uprights (75)
(76), and they must be oriented as shown in Detail A.
*SUGGESTION: When installing Facias, put bottom lag bolts in first and check that
measurements are correct and assembly is square before inserting top lag bolts.
2. Attach 4 Hole Facia (50) to Corner Uprights (76) using 5/16" Hardware (H108) and 1/4" Hardware
(H1).
3. Lay Corner Uprights (75) on the ground and attach 4 Hole Facia (50) to Corner Uprights (75) using
5/16" Hardware (H108) and 1/4" Hardware (H1). The Facia (50) must be flush with the bottom of
the Uprights (75).
4. Attach 4 Hole Facia with Rope Hole (52) to Corner Uprights (75) using 5/16" Hardware (H108) and
1/4" Hardware (H1). The Facia (52) must be 81" up from the bottom of the Uprights and oriented
as shown in Detail B..
*NOTE: If installing Double Wall Wave Slide opposite the swing beam side (B), install
Arched Facia (51) in place of 4 Hole Facia w/Rope Hole (52).
1 1/4"
1 3/4"
DETAIL A
50
75
1 3/4"
52
DETAIL B
H108
Upright Assembly
75
76
52
51
75
81"
H1
50
77
76
H1
H108
52"
18
H11
B
H3
H4
H56
75
50
H17
76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents