G G R R O O U U N N D D A A N N C C H H O O R R I I N N S S T T A A L L L L A A T T I I O O N N - PROformance Hoops Pro Series Installation & Owner's Instructions

Internal jack adjustable height goal system
Table of Contents

Advertisement

G G R R O O U U N N D D A A N N C C H H O O R R I I N N S S T T A A L L L L A A T T I I O O N N

Contacting buried utilities may cause serious injury or death. Before you
start digging, always contact your local One-Call system to help prevent
personal injury, interruption of services, environmental accidents or job
delays.
Electric lines can shock or electrocute. Gas lines can rupture causing
explosion or fire. Laser light in fiber optic cable can cause blindness.
One-Call will notify participating utility companies of your proposed
digging project. I I f f y y o o u u d d o o n n o o t t k k n n o o w w t t h h e e n n u u m m b b e e r r f f o o r r t t h h e e l l o o c c a a l l O O n n e e - - C C a a l l l l
i i n n y y o o u u r r a a r r e e a a , , c c a a l l l l t t h h e e N N a a t t i i o o n n a a l l O O n n e e - - C C a a l l l l a a t t 1 1 - - 8 8 8 8 8 8 - - 2 2 5 5 8 8 - - 0 0 8 8 0 0 8 8 f f o o r r t t h h i i s s
i i n n f f o o r r m m a a t t i i o o n n . . After being notified, utility companies will mark their
underground facilities by using the following international marking codes:
C C o o l l o o r r
Red
Yellow
Orange
Blue
Green/Brown
White
Pink
G G R R O O U U N N D D A A N N C C H H O O R R P P L L A A C C E E M M E E N N T T
I I M M P P O O R R T T A A N N T T – – When preparing for ground anchor, allow at least 6"
(152 mm) from all sides of ground anchor to wall of hole to allow for
sufficient concrete fill around anchor.
Use the following guidelines when installing ground anchor into a
l l a a n n d d s s c c a a p p e e d d a a r r e e a a next to the playing surface:
• • Top of ground anchor to be flush with or slightly above playing
surface.
• • Top of ground anchor must be level both directions across its
surface.
• • Concrete fill should have top sloped away from anchor in all
directions to shed moisture away.
• • Hinge side of anchor toward playing surface.
• • Hinge parallel with playing surface.
• • Distance from edge of playing surface to anchor to be no less than 6" (152 mm).
• • Distance from bottom of ground anchor plate to concrete fill to be no less than 1" (25 mm).
6 6
P P r r o o S S e e r r i i e e s s I I n n t t . . J J a a c c k k S S y y s s t t e e m m I I n n s s t t r r u u c c t t i i o o n n s s
D D e e f f i i n n i i t t i i o o n n
Electric
Gas, Oil or Petroleum
Communication, Telephone, TV
Portable Water
Sewer
Proposed Excavation
Surveying
w w w w w w . . p p r r o o f f o o r r m m a a n n c c e e h h o o o o p p s s . . c c o o m m
R R e e q q u u i i r r e e d d T T o o o o l l s s a a n n d d M M a a t t e e r r i i a a l l s s
• Spade
• Shovel
• Tape Measure
• Auger or Post Hole Digger
10-14, 60 lb. Bags of Dry
Concrete Mix
(or 1/4 - 1/3 yard of ready mix
concrete may be substituted
for the concrete mix)
Playing Surface
18" (0.5 m)
1 1 . . 8 8 8 8 8 8 . . 3 3 5 5 3 3 . . 4 4 6 6 6 6 7 7
• Level
• Stir Rod
• Water
6" (152 mm)
all sides

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro 672Pro 560Pro 660Pro 554Pro 454Pro 448

Table of Contents