Advertisement

Quick Links

Advantix Top bath drain
Instructions for Use
for bonded sealing (tiled shower) with sealing mat
Model
4914.20
en_INT
Year built:
from 01/2010

Advertisement

Table of Contents
loading

Summary of Contents for Viega Advantix Top 4914.20

  • Page 1 Advantix Top bath drain Instructions for Use for bonded sealing (tiled shower) with sealing mat Model Year built: 4914.20 from 01/2010 en_INT...
  • Page 2 Advantix Top bath drain 2 from 24...
  • Page 3: Table Of Contents

    Table of contents Table of contents About these instructions for use Target groups Labelling of notes About this translated version Product information Standards and regulations Intended use 2.2.1 Areas of use 2.2.2 Media 2.2.3 Drainage capacity Product description 2.3.1 Overview 2.3.2 Technical data Information for use...
  • Page 4: About These Instructions For Use

    This restriction does not extend to possible operating instructions. The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use.
  • Page 5: About This Translated Version

    About these instructions for use About this translated version This instruction for use contains important information about the choice of product or system, assembly and commissioning as well as intended use and, if required, maintenance measures. The information about the products, their properties and application technology are based on the current standards in Europe (e.
  • Page 6: Product Information

    2 Product information Standards and regulations The following standards and regulations apply to Germany / Europe. National regulations can be found on the relevant web site of your viega.com/standards . country at Regulations from section: Sealing Scope / Notice Regulations applicable in Ger-...
  • Page 7: Media

    Product information 2.2.2 Media The short-term temperature of the wastewater may reach up to 95° C. The temperature must be considerably lower in constant operation. The pH value must be higher than 4 but lower than 10. It is not permitted to introduce wastewater which would damage the product material.
  • Page 8: Technical Data

    Product information 6 - base unit 7 - sound protection mat 8 - adjusting feet 2.3.2 Technical data Nominal width [DN] (drain support) Ä Chapter 2.2.3 „Drainage capacity“ Drainage capacity on page 7 Ä Chapter 3.1.2 „Installation dimen- Dimensions and installa- sions“...
  • Page 9: Sealing

    Product information Mounting on a floor During the mounting on the floor, the drain is integrated into the floor construction. At the same time, it can e. g. be integrated into the level- ling screed or heat insulation. If necessary, a vertical drainpipe can be led through a drill hole in the floor at the same time.
  • Page 10 Product information Fig. 4: Diagram of a bonded seal Important note Careful planning is required for professional sealing. In addition, depending on the individual dampness wear class and the type of foun- dation, a suitable BS system with a building regulations certificate of suitability must be chosen.
  • Page 11: Fire Protection

    Product information 7 - Sealing collar 8 - Mat 9 - Adhesive flange Permitted bonded seals In connection with suitable drains, only approved bonded sealings with proof of practicability in keeping with building law may be used. See Ä „Regulations from section: Sealing“ on page 6 . Information regarding the procedure can be found in the instructions for use of the corresponding product.
  • Page 12: Required Accessories

    Product information Required accessories Advantix tops are available in a number of sizes and variations. You can also only buy an Advantix top frame and then purchase a suitable designer grate separately (see catalogue). Sieve insert The drain can be fitted with a sieve insert (model 4958) to collect dirt. Advantix Top bath drain 12 from 24...
  • Page 13: Handling

    Handling 3 Handling Assembly information 3.1.1 Important note Before assembly: Check if the drainage capacity of the drain is sufficient for the arising Ä Chapter 2.2.3 „Drainage capacity“ on page 7 . water volume Check if the installation height of the drain corresponds with the planned floor construction.
  • Page 14: Assembly

    Handling Assembly 3.2.1 Construction and water seal level Determine screed height. At a desired installation height of ≥ 105 mm upper edge sealing flange the floor piece remains in the delivery condi- tion. The water seal level is 50 mm and the immersion pipe length 48 mm.
  • Page 15 Handling Align the floor in such a way that the arrows point towards the drain pipe. Secure floor with clamping ring. Tighten the screw of the clamping ring with max. 2.5 Nm ±0.2 Nm. Alternatively, tighten the end of the clamping ring up to or between the markings.
  • Page 16: Mount Base Unit

    Handling Remove clamping ring and push floor piece in by two rings (2 x 10 mm). Align the floor in such a way that the arrows point towards the drain pipe. Secure floor with clamping ring. Tighten the screw of the clamping ring with max. 2.5 Nm ±0.2 Nm. Alternatively, tighten the end of the clamping ring up to or between the markings.
  • Page 17 Handling Requirements A pipe to the planned drainage position is already in place for the connection to the waste water system. The drain pipe has an internal sealing lip. Push the drain support into the drain pipe completely. Position bathroom drain with sound protection mat on the bare con- crete floor.
  • Page 18 Handling Place the adjusting feet into the retaining brackets. Align bathroom drain horizontally with help of the adjusting feet. Secure the adjusting feet with dowels and screws supplied. ð The bathroom drain can be integrated into the floor construc- tion. NOTICE! Product damage due to improper installation If hollow spaces occur during the lining of the drain, leaks...
  • Page 19: Sealing The Drain

    Handling 3.2.3 Sealing the drain NOTICE! Product damage due to improper installation If hollow spaces occur during the lining of the drain, leaks may occur when pressure is applied. Check the proper completion of the subsequent work. Screed and floor tiles must be laid at an incline of 1–2 % in the direction of the drain.
  • Page 20 Handling Lay the sealing collar into the bonded sealing. Apply a second layer of bonded sealing onto the sealing collar and, if necessary, onto the floor. Advantix Top bath drain 20 from 24...
  • Page 21: Mounting The Top

    Handling 3.2.4 Mounting the top The top with the grate must still be mounted to finish off the mounting of the drain. Proceed as follows: If necessary, the top with the grate must still be mounted to finish off the mounting of the drain. Proceed as follows: Remove yellow protective plug.
  • Page 22: Care

    Handling Cut the top flush to length with the upper edge of the tiles. Insert top without backflow seal. Lay tiles. Keep gap between top and flange free from surface seal and tile adhesive. Close the gap between grate and tiles with silicone. Care 3.3.1 Care tips...
  • Page 23: Cleaning The Drain

    Handling 3.3.2 Cleaning the drain We recommend using a mild cleaning agent and a washing-up brush for cleaning. Remove and clean grate. Remove and clean immersion pipe. Clean drain. Replace immersion pipe. Re-insert grate. Advantix Top bath drain 23 from 24...
  • Page 24: Disposal

    Handling Disposal Separate the product and packaging materials (e. g. paper, metal, plastic or non-ferrous metals) and dispose of in accordance with valid national legal requirements. Advantix Top bath drain 24 from 24...

Table of Contents