Opening And Closing Of The Vibration Control Unit; Maintenance - holthausen elektronik ESW-small-Compact User Manual

Electronic vibration monitoring unit
Table of Contents

Advertisement

Electronic Vibration monitoring Unit
ESW
®
-small-Compact

7. Opening and closing of the vibration control unit

The user must switch off the power supply, before opening the measurement unit. To open
the unit the user needs a 0,9mm type of wrench "inbus - key" and a forehead key with two-
bore nut, with size of 4mm. The case cover is ensured with a M2 screw. These must be
loosened before opening of the case cover, with an "inbus - key". After adjustment of the unit,
please control the position of the DIP-switches
Before closing the unit the O-Ring must be examine. You have to insert a new O-Ring
(43 x 2mm, LT170 – original spare part) if the old one is brittle, deformed, damaged or
already a few month in use.
Please pay attention that the thread and the interior room is oil- and dirt- free. Cleaning
around and inside the unit should be done only with clean and dry cloth. The closing and the
sealing of the unit is done after app. seven pitches of cover-nut thread, and ensured via the
M2 screw.
Advises for dismantling
Before dismantling the measurement unit, the power supply must be switched off. The
connection cable has to be loosened from the supporting surface to avoid damaging of the
cable. The vibration control unit should be set free via a 22mm wrench key.

8. Maintenance

The ESW
®
-small-Compact is maintenance free.
Tools for case cover opening:
Factory: H. Sartorius Nachf. GmbH & Co
0,9mm type of wrench (Inbus-key)
Adjustable forehead key for two bore nut size 4mm
phone +49 (0) 21 02 / 44 00 - 0
fax
8
holthausen
elektronik GmbH
+49 (0) 21 02 / 44 00 - 24

Advertisement

Table of Contents
loading

Table of Contents