Initial Functional Test - Telme GEL 20 Operating Instruction

Ice cream freezer
Table of Contents

Advertisement

10
5.4

Initial functional test

At the end of the installation, and before utilising the machine, it is indispensable to let a qualified
technician check the correct connection, by performing the following procedure.
-
Before starting, check that the socket's Main Switch is in the position "0";
-
check that Beater's Switch [24] on the machine is in the STOP position
applicable) is on OFF position;
-
plug in and turn socket's Main Switch to position "1";
-
turn Principal Switch
Remove the beater from the cylinder before carrying on the check, to avoid letting it function
dry. ATTENTION: Follow the directions reported on Par. 7.2 - Disassembly of parts.
ALWAYS
YOUR HANDS OR ANY OBJECT INSIDE THE REFRIGERATING CYLINDER
-
Open the lid, unscrew the fixing knob [7], pull out the beater [6] from the cylinder, then close the lid.
Note:
large-sized models do not operate when tie lid is open.
-
turn Beater's Switch [24] to BEATING
CLOCKWISE the machine is correctly connected and ready to be used;
Note:
do not unnecessarily start the refrigerator.
-
TRIPHASIC INPUT MODELS ONLY: If the rotation is COUNTERCLOCKWISE, the connection to the triphase
power supply is wrong, and must be changed proceeding as follows:
[23] (if applicable) to ON position: its indicator lamp should light up;
STOP THE MACHINE BY TURNING THE
position and check beater's shaft by looking through the lid. If it turns
-
stop machine by turning Beater's Switch [24] to STOP position
turn Principal Switch
-
Open the plug's shell and invert TWO of the THREE conductors connected at the
phases (R-S, R-T or S-T);
-
Close the plug's shell, plug in the machine and repeat the test.
(centre) and that Principal Switch
B
EATER
[23] to OFF;
T
'
URN THE SOCKET
S BREAKER TO THE
;
UNPLUG MACHINE
'
S
[24]
S
WITCH
BEFORE INTRODUCING
.
"0"
POSITION
English
Ice cream freezer
[23] (if
(centre) and
,
THEN

Advertisement

Table of Contents
loading

Table of Contents