Lorentz PS600 BADU Top 12 Instruction Manual

Lorentz PS600 BADU Top 12 Instruction Manual

Solar operated centrifugal surface pump

Advertisement

PS600 BADU Top 12
Solar operated
centrifugal surface pump
INSTRUCTION MANUAL
INSTALLATION
OPERATION
SERVICE
BERNT LORENTZ GmbH & Co. KG
Germany
www.lorentz.de / info@lorentz.de
release 050509
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PS600 BADU Top 12 and is the answer not in the manual?

Questions and answers

Summary of Contents for Lorentz PS600 BADU Top 12

  • Page 1 PS600 BADU Top 12 Solar operated centrifugal surface pump INSTRUCTION MANUAL INSTALLATION OPERATION SERVICE BERNT LORENTZ GmbH & Co. KG Germany www.lorentz.de / info@lorentz.de release 050509...
  • Page 2: Table Of Contents

    Manual PS600 BADU Top 12 Contents SYSTEM REPORT FORM ..........................5 ELECTRICAL INSTALLATION ........................... 4 Pump Controller PS600 ..........................4 Mechanical Installation ............................ 4 Controller Input Wiring ............................ 4 Electrical Installation - Terminals ........................5 Battery-Based System ............................ 5 Wire Sizing ..............................5 OPERATING THE PUMP ............................
  • Page 3: System Report Form

    Module Model # Controller Model PS600 Controller Serial # Thank you for purchasing a LORENTZ PUMP. Before you begin Check the model numbers of all the components of your system, and verify that they are the items that you ordered. Also...
  • Page 4: Electrical Installation

    Do not connect any electrical load to the voltage function to protect the batteries from deep solar array if it is not part of the LORENTZ discharge. The charger ( additional) is only needed Pump system. Connection of a battery for charging the batteries.
  • Page 5: Electrical Installation-Terminals

    Manual PS600 BADU Top 12 2.4 Electrical Installation-Terminals Power IN For PV-direct systems, a two-pole discon- No. 1 and 2 In order to protect the pump from being nect switch may be installed between the solar array damaged by dry running connect one well probe cable and the controller.
  • Page 6: Operating The Pump

    Manual PS600 BADU Top 12 OPERATING THE PUMP This explains the function of the switch and SWITCH the indicator lights on the pump controller. POWER ON/OFF When switched off/on during operation, it resets all system logic. Indicator lights SYSTEM (green) The controller is switched on and the power source is present.
  • Page 7 Manual PS600 BADU Top 12 Operating the Pump continued Starting the pump Be sure there is not a Time delays closed valve or other obstruction in the water 1. After pump stops due to insufficient line. sunshine – 120 SECONDS Fill the pump with clean water until the water 2.
  • Page 8: Automatic Controll For Full Tank Shut Off

    Manual PS600 BADU Top 12 Automatic Control For Full-Tank Shutoff sealed We recommend the use of a float switch or Float switch cable require- cable clamp other means to prevent overflow of your tank. ments This will stop the pump when the tank is full, 1.
  • Page 9: Trouble Shooting

    Manual PS600 BADU Top 12 TROUBLE SHOOTING Please read this section before calling for help. Inspect all wires and connections If you call for help, please refer to the model and serial 1. Look carefully for improper wiring (especially in a new numbers.
  • Page 10: Maintenace

    Manual PS600 BADU Top 12 MAINTENANCE Controller and Pump The controllers electronic has no moving or wearing parts. It requires no maintenance. There are rubber plugs to seal at the bottom, unused conduit holes. Inspect them to insure that the controller is sealed from moisture, insects, etc.
  • Page 11: System Wiring Diagram

    Manual PS600 BADU Top 12 System Wiring Diagram for Solar-direct (non-battery) System This is an example, using 4 X 12V-nominal PV modules. Your system may vary in the number, voltage, and configuration of PV modules. If the diagram for YOUR system is not attached here, ask your pump supplier.

Table of Contents