Sanyo ECO R410A Installation Instructions Manual page 7

Eco-i system air conditioner
Table of Contents

Advertisement

Table 1-4 (Floor-Standing & Concealed Floor-Standing)
Part Name
Connection pipe
Binding strap
Use M10 or 3/8" for suspending bolts.
Field supply for suspending bolts and nuts.
Figure
Q'ty
1
For connecting gas tubes
2
For gas and liquid tubes
2
For gas and liquid tube flare nuts
2
For gas and liquid tubes
7
For ends of flare insulator
1
For drain pipe
1
For drain hose joint
2
7
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents