Installing The Bracket To The Projector; Suspending The Projector - Panasonic ET-PKD120S Installation Instructions Manual

Ceiling mount bracket for low ceilings
Table of Contents

Advertisement

Installation (continued)

Installing the bracket to the projector

Install the angle adjusting bracket to the projector mount bracket (sold separately) that is pre-installed to the
projector (sold separately).
Note
z The illustration depicts an ET-PKD120B projector mount bracket as an example. The installation procedure is
the same for other projector mount bracket models.
"FRONT" inscription
Angle adjusting bracket
Projector mount
bracket
(sold separately)
Arrow

Suspending the projector

Suspend the projector from the attachment plate installed to the ceiling.
Screw hole
To the screen
Secure the angle adjusting bracket to the projector
mount bracket using the six supplied captive washer
screws (M6 x 16) as illustrated on the left.
Note
z The shape of the screw mounting section may differ
depending on the model of the projector mount
bracket (sold separately).
z For installing the projector mount bracket (sold
separately) to the projector, refer to the installation
instructions for the projector mount bracket.
1) Screw the supplied two captive washer hex head
bolts (M6 × 16) half way into two opposite side bolt
holes in the attachment plate, on the forward side
nearest the screen.
Attachment plate
Attention
z Make sure that the thread ridges of the temporarily
fastened captive washer hex head bolts are tightly
engaged with the screw holes on the attachment plate.
ENGLISH - 9

Advertisement

Table of Contents
loading

Table of Contents