Download Print this page

IAG -AFD-3004 Instructions Manual page 7

Tgv housings for 2015+ wrx

Advertisement

10. Slide the new passenger side TGV housing in place.
Make sure the orientation is correct and place the (4)
12mm bolts in place. Thread them in by hand lightly and
repeat for the driver side. Then torque all (8) 12mm bolts
using a ratchet and 12mm socket to 25Nm/18.4 ft-lbs.
11. Reinstall the EGR flange line back on to the intake
manifold using the (2) OEM 12mm bolts. Torque the bolts
to 19Nm/14 ft-lbs.
12. Reinstall the battery / starter wire back on to the
driver side strut tower bracket.
13. Reinstall the Intercooler, OEM engine cover and
negative battery terminal
14. Flash the new ECU MAP into the vehicle. Start the
vehicle, check for leaks.
IAG Performance | 1203 Baltimore Blvd. Westminster, MD 21157 | Ph: 410-840-3555 | www.iagperformance.com
7

Advertisement

loading