Dunkirk D247 Installation Instructions Manual page 9

Gas-fired steam or vvater boiler
Table of Contents

Advertisement

LEFT
END
BATTERY
BASE
ASSEMBLY
FIGURE 6
ATTACH
DRAFT
HOODS
Attach the draft hood(s) to the boiler sections after apply-
ing boiler putty to the top of the boiler sections where the
hoods and sections meet. Use (J) bolts to attach front of
draft hood to slots in sections flange.
END
CLOSING
PLATE
WARNING:
DO NOT ALTER OR MODIFY DRAFT HOOD
FURNISHED WITH BOILER.
CLEAN
OUT
COVER
PANEL
DRAFT
HOOD
APPLY
BOILER
PUTTY
FIGURE 7
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents