Download Print this page

Pentair Raychem EMK-XP Installation Instructions Manual page 5

Electromelt power connection and end seal kit

Advertisement

16
• Slide 2 in (51 mm) long clear yellow
tube (Item D) over braid wire/ground
connector.
• Shrink tubes completely and
immediately pinch end while tube is
still hot; hold for 5 seconds to ensure
seal.
• Allow tubes to cool.
17
• Cut two 3 in x 1 3/4 in (76 mm x 44 mm)
pieces from one mastic sheet (Item J).
3 in
(76 mm)
19
• Cut a 3 in x 5 in (76 mm x 127 mm)
piece from one mastic sheet (Item J).
3 in
(76 mm)
tHerMAl builDing solutions
2 in (51 mm)
clear yellow
shrink tube
1 ¾ in
(44 mm)
5 in
(127 mm)
Raychem-IM-H57284-EMKXP-EN-1612
1½ in
(38 mm)
Hold for 5 seconds
18
• Wrap each power
wire with a 3 in x 1 3/4
in (76 mm x 44 mm)
piece of mastic.
(44 mm)
20
• Fold the
covered
power wires
flat against
the heating
cable.
• Use the 3 in x 5 in (76 mm x 127 mm) mastic sheet
to cover the first mastic sheet, bus wires, and wire
connectors. Do not cover outer jacket with mastic.
1¾ in
5 in
(127 mm)
5 / 10

Advertisement

loading