Porter 6255-1 Installation And Operating Instruction Manual

Compact triple wall outlet station

Advertisement

Quick Links

COMPACT TRIPLE WALL OUTLET STATION MODEL 6255-1
INSTALLATION AND OPERATING INSTRUCTIONS
See Page 3 and 6 for Dimensions

STATION INSTALLATION INSTRUCTIONS

1.
:

LOCATION

Select appropriate location for
mounting station to a stud prior to installing
drywall or wall board.
right side) to stud. (Figure 1)
WARNING
Porter, Outlet Stations utilize the cross+protection
system. The copper tubing is diameter indexed; 3/8"
O.D. for Nitrous Oxide and ½" for Oxygen. The
cross+protection system is designed to prevent
misconnection of Oxygen and Nitrous Oxide piping.
DO
NOT
ATTEMPT
DIAMETERS! Tampering with the cross+protection
system constitutes acceptance of liability by the
installer. For your own protection, as well as that of
the Doctor and the patients, use 3/8" O.D. tubing for
all Nitrous Oxide lines and ½" O.D. tubing for all
Oxygen lines.
Secure bracket (left or
TO
CHANGE
THE
To assure safe operation and conformation to local
fire codes, all Porter Outlet Stations are designed to
be used with sedation delivery systems mounted
inside walls and they meet or exceed the guidelines
established
by
the
Association for Nonflammable Medical Gas Systems,
NFPA 99. Copies of NFPA 99 or portions thereof may
be obtained by writing to:
National Fire Protection Association
Batterymarch Park, Quincy, MA 02269-9904
Or call: 1-800-344-3555
The Porter Compact Triple Wall Outlet Station (6255-
1) provides a quick, safe, and reliable method of
connection to both Porter Sedation and Clean-Air™
outlet service. The 6255-1 provides all the service
features of the Porter 6200-1 N
and the Porter 5600-3 Clean-Air outlet station.
Features include the cross+protection system to
prevent unintentional misconnection to the central
piping system. The outlet station utilizes a duplex
connector which prevents the Nitrous Oxide from
being connected unless the Oxygen is connected,
and
offers
oxygen
compatibility. Compact stainless steel face plate is
color coded for instant gas identification. A qualified
plumber can install the outlet station by following the
details listed in this brochure.
Figure 1
National
Fire
Protection
O/O
outlet station,
2
2
resuscitator
quick
connect
FM-962 Rev. D 11/21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 6255-1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Porter 6255-1

  • Page 1 COMPACT TRIPLE WALL OUTLET STATION MODEL 6255-1 INSTALLATION AND OPERATING INSTRUCTIONS To assure safe operation and conformation to local fire codes, all Porter Outlet Stations are designed to be used with sedation delivery systems mounted inside walls and they meet or exceed the guidelines...
  • Page 2 Figure 2 2. PIPING REQUIREMENTS Sedation Outlet Connections (N 2.1. This portion of the 6255-1 outlet station has the option of unscrewing the gas block, ) (Figure 2) from the support plate (three screws), inverting the block so the pipes may extend downward (Figure 3).
  • Page 3 DRYWALL OR WALL BOARD CUT-OUT AND STATION FIXTURING DETAILS Figure 4 3.1. Closing up walls requires a 2 1/2” H. x 4 1/2” L. cut-out opening. See template diagram for actual cut-out outline on page 6. 3.2. Bracket opposite stud butts up to underside of drywall.
  • Page 4 Slide the clip back onto the assembly in a from being connected unless the Oxygen is position 180° from its original location. connected. The Porter 5602 vacuum quick connect As the clip is brought down onto the post, place with hose barb separately inserts into the vacuum the spring onto the pin (located on the clip), and check valve of the station.
  • Page 5 MONTHLY CHECK SERVICE PRIMARY CHECK VALVE Leak test the entire system for working May be serviced with station pressurized to pressure leaks. Connect an 8060 series duplex 50 PSI. connector and hoses into the Triple Outlet Station. Attach the other end of the hoses to a flowmeter and 1.
  • Page 6 SECONDARY CHECK VALVE DISASSEMBLY AND SERVICE INSTRUCTIONS WARNING To service the secondary check valve, first turn off pressure. Do not remove the cartridge body until the pressure is bled off. The secondary check valve cannot seal the 50 PSI pressure if the cartridge body is removed. 1.

Table of Contents