Daikin DCG Series Installation And Maintenance Manual page 35

Light commercial packaged gas units 15–20 tons
Table of Contents

Advertisement

DCG1803503V*& DCG2404003V* THREE PHASE 208/230/60 HZ BELT DRIVE WIRING DIAGRAM
L 1
1
F
4
5
3
IIC
6
8
E CON
1 2
9
2
1 0
11
STATUS L IGHT
EQ UIPM ENT STATU S
ON
NO R MAL O PER ATION
OFF
INT ERN AL CON TROL
1 BLIN K
PRESSUR E SW ITCH
2 BLIN KS
PRE SSUR E SW ITC H CL OSE D
3 BLIN KS
W ITH OUT IN D U CER O N
4 BLIN KS
OPEN L IMIT SWIT CH
FALS E FL AM E SENSED
5 BLIN KS
6 BLIN KS
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.
SUPPLY VO LTAGE
2 08- 2 40/3 /60
T
R
2 4 V
AL S
R S
PS
HPS2
LP S2
SEE
N OTE 2
7
7
4
4
1
1
CH E CK
-- ----
CH ECK INPU T PO WER
NO PO W ER OR
CH ECK FU SE ON CO N TROL
REPL ACE C ONTR O L
GA S FL OW
IGNIT ION FA IL UR E
GA S PRESSUR E
OPEN R OLL OU T
GAS VALVE
SW ITC H
FL AM E SENSO R
FL AM E R OL LOU T
OPEN AU X. L IMIT
B AD SW ITC H
SW ITC H
AUX. L IM IT O PEN
CH E CK
OP EN
PRES SUR E SW ITCH
CH ECK
PRES SUR E SW ITCH
M AIN LIM IT OPEN
BAD SW ITC H
STIC KING G AS VALVE
COM P RESSOR
3 MIN. COM P.
O UT PUT D ELAY
A NT I-C YC LE TIM ER
33
L 2
5 . F OR TW O STAGE OPERAT IO N REM OVE
W 1 TO W2 W IR E JUM PER .

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents