How To Install The Remote Controller (Optional Part); Indicator Section Installation; Operation Controller Installation - Technibel CAV254R5TAA Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

4. HOW TO INSTALL THE REMOTE CONTROLLER (OPTIONAL PART)

I ACCESSORIES
Outdoor Unit Cooling only models
No.
Operation controller
EG
Indicator section
Wireless remote controller
AAA alkaline battery
Outdoor Unit Heat pump models
No.
Operation controller
Indicator section
Remote controller
Remote controller mounting
cradle
Battery

4-1. Indicator section Installation

• Remove the mark section and install the indicator section.
(1)
Remove the ceiling panel.
(2)
Remove the corner cover behind the mark section. (3 screws)
(3)
Remove the mark section inside the ceiling panel. (2 screws)
(4)
Install the indicator section in the location where the mark section was attached. (2 screws)
(5)
Form the wire to match the panel ribs as in the Fig. 4-2.
(6)
Install the corner cover. (Restrain the wire with the corner cover.)
3 screws
Fig.4-1
Accompanying parts
Run
Timer Heating preparations
Accompanying parts
Air intake grille
Mark section
(indicator section)
Ceiling panel
Corner cover
No.
Q'ty
Instruction Manual
1
Tapping screw
1
Tapping screw
1
Vinyl clamp L 150
1
Alarm message label
Q'ty
No.
Spacer
1
Instruction Manual
1
Pan-head tapping screw
1
4 x 10
Truss-head tapping screw
1
4 x 16
Vinyl clamp
2
L 150
ALARM MESSAGE LABEL
2 screws
Fig. 4-2
Indicator section
9
Accompanying parts
Special
screw
4 x 16 mm
TOTA 4 x 16
Accompanying parts
Pass the wiring through under the shaft.
Wiring
Q'ty
1
1
1
3
1
Q'ty
2
1
4
2
3
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cav364r5taaCav484r5taa

Table of Contents