Dell PowerEdge C6220 II Getting Started page 8

Hide thumbs Also See for PowerEdge C6220 II:
Table of Contents

Advertisement

Available languages

Available languages

On each vertical rack flange on the back, put tw o s crew bases into
4
the t wo square holes right above the rail. See F igure 3.
Inst all t he chass is stabilizer s hipping brackets (optional) on the back
5
rack flanges.
Inst all and tight en the s crews.
6
NOTE : To transport systems already installed in the rack, ensure that the two
chassis stabilizer shipping brackets (optional) are in place.
Figure 3. I ns talli ng the Chassis Sta bili zer Shi ppi ng Brackets
Getting Started With Your System
|
6

Advertisement

Table of Contents
loading

Table of Contents