Installation
Foundation for Installation
• Fix the unit tightly with bolts as shown below so that the unit will not fall down due to earthquake.
• Noise and vibration may occur from the floor or wall since vibration is transferred through the in-
stallation part depending on installation status. Thus, use anti-vibration materials (cushion pad)
fully (The base pad shall be more than 200 mm (7-7/8 inch)).
392(15-7/16)
Drain pipe connection
- Hydro Kit does not use the drain pump.
- Do not install in upward direction.
- Install the drain pipe in downward direction (1/50-1/100).
- Hydro Kit drain connection pipe is PT 1.
Hydro kit
12 Hydro Kit
Concrete
base
Support
75(2-15/16)
(Unit: mm(inch))
Hydro kit
Anti-vibration material
3 or more screw
threads of the
2 bolts must be
shown
Nut
Spring washer
Flat washer
Anchor bolt