Installation; Setup; Tools; Procedure - IPS Controllers M790 Owner's Manual

Ph/orp controller
Table of Contents

Advertisement

M790 pH/ORP Controller Owner's Manual
II. Installation
A. Setup
1. Turn off all peripheral equipment such as heaters, chemical
feeders, and pumps.
2. Relieve pressure from the filtration system.
B. Tools
1. Cordless drill
2. 1/4" NPT Tap
3. 7/16" drill bit
4. Masonry drill bit and anchors, or other appropriate fasteners
5. 13/16" wrench or channel-lock pliers
C. Procedure
1. Location
a. Wall area with easy access
b. Within 8 feet of feeder
c. At least 10 feet from water edge
d. Close proximity to time clock
e. Within 6 feet of GFCI power source
2. Mounting
Note: The controller and flow cell are factory mounted to the ABS
board for convenience.
a. Securely mount ABS mounting board with M790 controller
and flow cell on wall (vertical installation).
b. If applicable, securely attach the peristaltic pump with the
provided hardware.
11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M790 and is the answer not in the manual?

Table of Contents