Step 10 Installing The Drain Hose And Drain Pipe - Samsung AE071MNMPEH Installation Manual

Table of Contents

Advertisement

Refrigerant pipe before EEV kit and MCU or without EEV kit and MCU
• You can contact the gas side and liquid side pipes
but the pipes should not be pressed.
• When contacting the gas side and gas side pipe, use
1 grade thicker insulator.
Refrigerant pipe after EEV kit and MCU
• Install the gas side and liquid side pipes, leave
10mm of space.
• When contacting the gas side and liquid side pipe,
use 1 grade thicker insulator.
Insulation
Insulation
Liquid pipe
Gas pipe
10mm
10mm
10mm
Gas pipe
Liquid pipe
Step 10 Installing the drain hose and
drain pipe
1 Push the supplied drain hose as far as possible over the
drain socket.
2 Tighten the metal clamp as shown in the picture.
3 Wrap the supplied large sealing pad over the metal
clamp and drain hose to insulate and fix it with clamps.
4 Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope, fit
the hose with drain raising piping (field supply).
5 Push the drain hose up to insulation when connecting
the drain hose to drain socket.
Metal clamp
Large seailng pad
Drain hose
Drain socket
Drain hose
Drain pipe
Be sure to bond the drain
hose and the main pipe.
PVC Tube Joint
+ VP25 (OD: 32 mm, ID: 25 mm)
Drain pipe
17
English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents