Brazing work

7. After brazing, put the Pipe insulation(D) on the EEV Assembly(E) and fold the Pipe
insulation(D) mentioned below (after pealing off the liner).
8. Secure the pipe fixing bracket(C:2EA) in place again (4 x M4)
9. Make sure that field pipes are fully insulated.
Field pipe insulation must reach up to the insulation you have put back in place as per
procedure step 7. Make sure that there is no gap between both ends in order to avoid
condensation dripping (finish the connection with tape eventually).