Fig - Siemens FCV-500 Instructions Manual

Vacuum circuit breakers with stored energy operator
Table of Contents

Advertisement

HANDLING INSTRUCTIONS
Move breaker to installation location with fork lift or crane (A) .
Carefully remove protecti ve plastic cover or crate.
R emove ramp pieces nailed to the pallet at the front of the breaker
Remove hold down bolts located on each side of breaker
Place ramp pieces in front of the pallet in line with breaker wheels and nail to pallet as shown by
arrows in
( D ) .
Slowly roll breaker off pallet (E
& F ).
CA U T I O N - R EMOV E PACKAG I N G . B R EAK ER S A R E SH I PP E D
I N C LOSED POS IT ION W I T H T H E TR I P R O D A N D FOOT
L E V E R E NC LOSED BY PAC KAG I NG TO PR EVENT O P E N I NG
D U R I N G SH IPM E NT.
( B )
1

Fig.

- Circuit B reaker Hand l i ng I nstructions
- 1 7-
(B).
( C ) .
(C)
( F )

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcv-750

Table of Contents