LG PRDCA0 Installation Manual page 30

Ahu communication kit
Table of Contents

Advertisement

THERMISTORS INSTALLATION
30
Installation of the pipe thermistor cable
1
Put the thermistor cable in a separate protective tube.
2
Always add a pull-relief to the thermistor cable to avoid strain on the thermistor cable and
loosening of the thermistor. Strain on the thermistor cable or loosening of the thermistor may
result in bad contact and incorrect temperature measurement.
Fixation of the pipe thermistors (Field work)
1
Fix the thermistor with insulating aluminum tape (Field supply) in order to ensure a good heat
transfer.
2
Put the supplied piece of rubber around the thermistor (EBG61287703/04) in order to avoid
loosening of the thermistor after some years.
3
Fasten the thermistor with 2 tie wraps (Field Supply)
4
Insulate the thermistor with insulation sheet(Over 5t, Field Supply)
1
1
45°
2
2
3
Tie wrap
Thermistor
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents