Woods BRUSHBULL BB6000X Operator's Manual page 33

Rotary cutter
Table of Contents

Advertisement

DUAL TAILWHEEL INSTALLATION
BB7200X, BB8400X (OPTIONAL)
1. Attach dual tailwheel (1) to main frame (D) using
position A and desired height location as shown in
Figure 35.
2. Secure with cap screws (17) and hex nuts (18).
3. Torque hardware to 175 lbs-ft.
Figure 35. Dual Tailwheel Installation
(Rev. 4/24/2009)
MAN0680 (11/30/2007)
1. Dual tailwheel
17. 5/8 NC x 2-1/2 HHCS
18. 5/8 Flange lock nut
A. Tailwheel pivot hole
D. Deck, BB7200X &
BB8400X
CHECK CHAIN INSTALLATION
(OPTIONAL)
Check chains are used to carry the front of cutter at a
set height. See Figure 36.
1. Thread check chains (3) through check chain
bracket (2).
2. Attach lower end of check chain (3) to mast plate
(9) with bolt (6), washer (7), and nut (8).
3. Attach keyhole brackets (2) to each side of tractor
top link bracket (10) with bolt (4) and nut (5).
2. Check chain bracket
3. 3/8 Chain, 32-link
4. 3/4 NC x 6 HHCS GR5
5. 3/4 NC Lock nut
6. 5/8 NC x 2-1/4 HHCS GR5
7. 5/8 Flat washer
8. 5/8 NC Hex nut
9. Mast Plate
10. Tractor top link bracket
Figure 36. Optional Check Chain Assembly
Assembly 33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brushbull bb7200xBrushbull bb8400x

Table of Contents