Download Print this page

Installation Procedure - Mitsubishi Electric GT15-J71GP23-SX User Manual

Got2000/got1000 series cc-link ie controller network communication unit
Hide thumbs Also See for GT15-J71GP23-SX:

Advertisement

4. INSTALLATION PROCEDURE

The installation procedure for the CC-Link IE communication unit is
explained using the GT1575.
(1) Power off the GOT.
(2) Remove two extension unit covers of the GOT.
(3) Attach the extension interface relay board to the extension interface 2 on
the GOT.
After the installation, detach the connector cover from the extension
interface relay board.
For the following GOT types, the extension interface relay board is not
needed.
•GT1655,GT155
•GT27,GT25 of the GOT2000 series
(4) Fit the CC-Link IE communication unit in the GOT case.
4)
(5) Fix the CC-Link IE communication unit by tightening its mounting screws
(4 places) with a tightening torgue of 0.36 to 0.48 N•m.
of the GOT1000 series
6
Remove the connector cover.
3)

Hide quick links:

Advertisement

loading