A. Water Heater Location
B. Water Supply
C. Gas Supply
D. Relief Valve
E. Venting
F. Wiring
18
Close to area of vent termination.
Indoors and protected from freezing
temperatures.
Proper clearance from combustible surfaces
observed and water heater not installed on
carpeted floor.
Sufficient fresh air supply for proper
operation of water heater.
Air supply free of corrosive elements and
flammable vapors.
Water heater completely filled with water.
Air purged from water heater and piping.
Gas line equipped with shut-off valve, union
and sediment trap.
Approved pipe joint compound used.
Temperature and Pressure Relief Valve
properly installed and discharge line run to
open drain.
Vent length verified.
Heater vented separately from all other
appliances.
Proper materials and techniques used in vent
assembly.
Vent pipe properly secured to blower
housing.
Correct power supply (120V) 50/60 Hz.
Electrical Connections tight.
Provisions made to protect area from water
damage.
Sufficient room to service heater.
Combustible materials, such as clothing,
cleaning materials, rags, etc. clear of the base
of the heater.
Clearances of 1" (2.54cm) from combustion
air inlet openings observed.
Water connections tight and free of leaks.
Soap and water solution used to check all
connections and fittings for possible gas leak.
Gas Company inspected installation (if
required).
Discharge line protected from freezing.
Vent termination/screen installed.
Vent pipe supported at required intervals.
Appropriate minimum clearance observed.
Precautions taken to prevent moisture
damage around vent termination.
Heater properly ground and proper polarity
observed.