SYSTEM START-UP
ENERGIZE CRANKCASE HEATER
This unit is equipped with crankcase heaters for both the lead
and follower compressors. The operation of the crankcase
heater is monitored by means of the control board.
CAUTION: An attempt to start the compressor without at least
8 hours of crankcase heat will damage the com-
pressor.
A warning label with an adhesive back is supplied in the unit
installation instruction packet. This label should be attached to
the field supplied disconnect switch where it will be easily seen.
See below.
IMPORTANT
IF POWER HAS BEEN OFF FOR 8 HOURS OR LONGER,
DISCONNECT SWITCH MUST BE TURNED ON 8 HOURS
BEFORE THERMOSTAT IS SET TO "HEAT","COOL" OR
"AUTO"
035-03095.
In order to energize the crankcase heater:
- Set indoor two stage cooling thermostat to "OFF" position.
- Close the line power disconnect to the unit.
CHECKING SYSTEM CHARGE
The factory charge in the outdoor unit is listed in the Table 5 as
well as unit nameplate and includes enough charge for the unit
and the corresponding indoor evaporator coil. This unit in-
cludes sufficient charge for 15 feet of line sets. Table 6 lists the
refrigerant line charges for additional lengths.
CAUTION: REFRIGERANT CHARGING SHOULD ONLY BE
CARRIED OUT BY A QUALIFIED AIR CONDI-
TIONING CONTRACTOR.
TABLE 4 - SUB-COOLING CHART
Required Subcooling Temp. ° F
LIQUID
PRESSURE
5
(PSIG) @
Liquid Line Temperature ° F
SERVICE
PORT
139
73
146
76
153
79
161
82
166
85
179
89
187
92
196
95
202
97
208
99
220
103
229
106
236
108
246
111
256
114
Central Environmental Systems
10
12
15
68
66
63
71
69
66
73
71
68
77
75
72
90
88
85
84
82
79
87
85
82
90
88
85
92
90
87
94
92
89
98
96
93
101
99
96
103
101
98
106
104
101
109
107
104
In order to check whether the unit has the required charge in
the system, follow the procedure described below.
WARNING:DO NOT VENT REFRIGERANT TO THE ATMOS-
PHERE. IT IS NECESSARY TO RECOVER THE
REFRIGERANT DURING ANY REPAIR OR IN-
STALLATION OF THE SYSTEM.
1. Set room thermostat at desired temperature. The thermo-
stat may be energized at first (Y1) stage or second (Y2)
stage. If only the first stage (Y1) is energized, only the lead
compressor will be in operation. Both the compressors will
be in operation if the second stage of thermostat (Y2) is
energized.
Set room thermostat at "COOL" position and fan switch at
"AUTO" or "FAN" position. There is a five minute delay
when the "system control board" is powered for the first
time. Refer to "System Functions" for more information
about time delays.
2. Operate the unit for a minimum of 15-20 minutes before
checking the charge.
3. Verify the desired indoor air handler air flow (CFM).
4. The system charge should be varified with only the lead
compressor running, however it can be also checked with
both the compressors running at the same time at the rated
indoor air handler air flow. However, it is required to estab-
lish the subcooling level at any one condition i.e. either with
the lead compressor running or when both (the lead and
follower) compressors are running.Recommended sub-
cooling temperature is listed in Table 3.
TABLE 3 - RECOMMENDED SUBCOOLING
MODEL
H1DS036
H1DS048
H1DS060
*Lead compressor is designated / labeled as the # 1 com-
pressor. Follower compressor is the # 2 compressor.
LIQUID
PRESSURE
20
5
(PSIG) @
SERVICE
PORT
58
264
116
61
271
117
63
276
120
67
285
122
80
301
126
74
309
127
77
317
130
80
325
132
82
333
134
84
342
136
88
350
138
91
359
140
93
368
142
96
377
144
99
386
146
RECOMMENDED SUBCOOLING °F
LEAD
LEAD + FOLLOWER*
COMPRESSOR
(BOTH)
ONLY
COMPR. RUNNING
10
10
10
Required Subcooling Temp. ° F
10
12
15
Liquid Line Temperature ° F
111
109
106
112
110
107
115
113
110
117
115
112
121
119
116
122
120
117
125
123
120
127
125
122
129
127
124
131
129
126
133
131
128
135
133
130
137
135
132
139
137
134
141
139
136
550.37-N1Y
18
18
18
20
101
102
105
107
111
112
115
117
119
121
123
125
127
129
131
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H1ds060H1ds036

Table of Contents