General Installation Procedure

The following instructions can save installation time. Detailed, illustrated instructions for each
component are given in the following sections.
CAUTION!
To ensure that your system is correctly installed, please follow the steps outlined below. If you
follow these steps, installation will be fast and efficient. If you do not follow these steps, you
may have incorrectly installed the hardware.
1.
2.
3.
4.
5.
3.3.1

Installation Procedure Flowchart

Table 3.1 shows a flowchart of the installation procedure. As you complete each step, check
off the "Done" box on the right. Please use this flowchart in conjunction with the instructions
that follow.
Step
Table 3.1 Installation Procedure Flowchart
Bosch Security Systems
Do not disassemble or modify the BBU. If disassembled, the BBU could leak acid, over-
heat, emit smoke, burst and/or ignite.
Do not pierce the BBU with a sharp object, strike it with a hammer, step on it, or throw it.
These actions could damage or deform it, internal short-circuiting can occur, possibly
causing functional defects, acid leaks, and other hazardous results.
If the BBU leaks, gives off a bad odor, generates heat, becomes discolored or deformed,
or in any way appears abnormal during use, recharging or storage, immediately remove it
from the subsystem and stop using it. If this is discovered when you first use the BBU,
return it to Bosch or your system vendor.
Unpack: Unpack the subsystem and confirm that all the components on the Unpacking
Checklist have been included.
Rack/Cabinet installation: If the subsystem is going to be installed in a rack or cabinet, it
should be installed prior to installing the hard drives. Installing the subsystem into a rack
or cabinet requires at least two (2) people.
Install drive trays: After the hard drives have been installed into the drive trays, the drive
trays must be installed into the enclosure itself. (See Section 3.6 Drive Tray Installation)
Cable connection: Use the power cords that came with the subsystem to connect the
subsystem to the main power source. Use self-purchased SCSI cable to connect host
ports to servers.
Power up: Once the components have been properly installed and all cables are properly
connected, you can power up the subsystem and configure the RAID array. (See
Section 5.4 Power On)
Installation Procedure
1
Unpack
3
Rack/Cabinet Installation
5
Drive Tray Installation
6
Cable Connection
7
Power On
Done
See Section 3.4 Unpacking the Subsystem
See Section 3.5 Rackmounting
See Section 3.6 Drive Tray Installation
See Section 5.4 Power On
Hardware Installation | en
19
F.01U.027.797 | V1 | 2006.05

Advertisement

Table of Contents
loading

Table of Contents